Successful Completion of Factory Training for Saudi Arabia Engineer(2010-05-12)
Two (2) engineers from Saudi Arabia come to our factory for 15KVA Parallel UPS training from April 30th to May 6th, 2010. Powtech offer them very professional factory training from introduction, basic installation, operation, parallel connection and maintenance. After this training, both of these two engineers have passed the training test and won Certificate of Training awarded by Powtech.
Grid-connected inverter has been exported to Europe(2010-04-10)
Recently, Powtech has exported our PV Grid-connected inverters and Wind turbine Grid-connected inverters to Europe, open the European market for new energy product.
Powtech got the bid of 50KM OPGW optical cable of Russia(2010-03-10)
Recently, Powtech has won the 50KM OPGW optical cable of Russia. Powtech win the contentment by our good products, professional and fast service.
NEC project manager
send appreciation letter to Powtech for
the quick delivery and firm support (2009-03-16)
Dear Sir,
I am the project manager of NEC project.
ADSS project is the first application of
Huawei, Sudan. During this project, Qingdao
Powtech Electronic Co., Ltd patiently provides
us technical solution with very quick response.
Their firm support and quick response are
very appreciated by the whole project team.
Therefore, we recommend Qingdao Powtech
Electronic Co., Ltd to you hopefully you
can get the same firm support and quick
delivery for your project too.
B’Regards
Powtech won NEC ADSS
Project Phase-A (2008-Sept.-16)
NEC ADSS project phase-A is 370km transmission
line. Powtech has won the project to supply
ADSS accessories
Powtech won Vietnam
Viettel ADSS/OPGW Hardwares Project (2008-Feb)
POWTECH dispatches represent to attend the China-ASEAN EXPO (2007-Nov-01)
The 4th China-ASEAN EXPO is held in Nanning, Guangxi from Oct. 28th to 31st, 2007. The EXPO is targeted on electric power and other areas to strengthen the China-ASEAN business. POWTECH dispatches one respresent to attend this EXPO and expand its business in ASEAN region. During the EXPO, we meet pontential customers and parterners from Combidia, Indonesia, Malaysia, Burma, Philippine, Singapore, Thailand, Vietnam and etc.
UPS-Modular series Modular Redundant UPS Release (2007-May-10)
After two years’ research & development, our UPS-Modular series Modular UPS is put into market today (May 10th, 2007). It’s a big and exciting news for our company and customer. The UPS can operate independently, and can also be connected in parallel (up to 5 units), which is easy and flexible to expand system capacity and improve its reliability.
TDDF series Digital Distribution Frame Release (2007-Feb-01)
The TD-DDF series digital distribution frame is developed and released to market on Jan, 2007.
Wind Turbine Grid-tie Inverter" Successfully Released (2005-Dec)
WING series “Wind Turbine Grid-connected Inverter" successfully passed the expert appraisal and released to market.
Wind turbine energy are constantly on the upswing, which is good news for both nature and our energy balance. Powtech had developed a new series of Grid-tied inverters to keep up with the trend towards increasingly powerful systems.
The small-scale Wind Turbine Grid-tied Power Generation is more convenient, economical and practical than Solar PV Gri-tied Power Generation. Besides it is easy to install, low investment cost, and short construction periods. It has become an important trend for the application of wind power generational both domestic and abroad.
The Grid-tied inverters are the core devices of the solar PV power plant. They can convert DC power generated by wind turbine into high-quality AC power, then feed AC power to electricity grid. Thus, no storage battery is required, investment is saved and maintenance is reduced.
Add: 5F. No.177 Zhuzhou Road, Huite Industrial City,High-tech Park, Qingdao, China
Tel: +86-532-88721735 +86-532-88721733 +86-157-2525-1178 Fax: +86-532-88721733
Cell: +86-136-6889-0402 Email:sales@powtech-cn.com CopyRight 2007 POWTECH All rights reserved